For the National Museum, 2025 was a year of rapid growth in attendance, placing greater demands on security, technical management and the maintenance of heritage-listed buildings. The Museum’s priorities remain the creation of a safe and comfortable environment for visitors, the protection of its collections of inestimable value, and the systematic care of its historic buildings. Close cooperation among all the specialists involved, security personnel and technical experts made it possible to combine demanding daily operations with extensive modernisation projects and exceptional security measures.

Security

In 2025, the National Museum also faced exceptional security situations that tested staff preparedness and the effectiveness of emergency plans:

Blackout: On 4 July 2025, a widespread power outage affected the Czech Republic. The National Museum responded immediately by reinforcing security and initiating a controlled evacuation of visitors. The situation lasted approximately three hours, and the rapid response prevented any damage to the Museum’s property. Security for international loans: In August, unique exhibits from the National Palace Museum in Taipei were transported in two stages for the exhibition “100 treasures, 100 stories”. The transport took place under strict security measures.

Facility management

Historical Building of the National Museum – Renovation of Stone Floors

Alongside the daily care required to keep the building running smoothly, in 2025 we focused on extensive work on the stone floors. The aim was to repair damage including crumbling joint fillers, loose mosaic stones, surfaces dulled by wear, minor scratches and grooves, and a generally worn protective coating.

After the carpets, the stone floors are among the most heavily used elements of the building’s historic interior. They are exposed both to large numbers of visitors and to the natural ageing of materials, and were therefore already showing signs of wear. Repairs and renewal of the protective impregnating layer were needed to preserve their original appearance and extend their lifespan.

The renovation respected the historical value of the materials and preserved their original appearance while meeting requirements for functionality and long-term sustainability. The Operations Department worked with conservators and building specialists to ensure that all work complied with applicable standards and heritage conservation requirements.

A further requirement was to keep the Museum operating as fully as possible and minimise the impact of the building work on visitors and staff. Work was always carried out at night, outside the Museum’s opening hours and scheduled events.

Floors were repaired and renovated in the building’s most prestigious spaces, including the Pantheon, foyer, main staircase galleries and western hall, as well as other areas in everyday use. A total of 2,929.33 m² of flooring was renovated last year.

The repairs included precise grout injection, renewal of the bedding beneath stone slabs, deep cleaning, and the replacement of joint fillers and missing sections of stone.

Work on the Venetian mosaic in the main staircase gallery was particularly demanding and detailed. This 435 m² surface consists of small pieces of stone, each measuring approximately 1.5 cm × 1.5 cm.

The renovation was successful, achieving excellent functional and aesthetic results and ensuring that the floors are ready for safe use for years to come.

Central Depositories Terezín I and II

At the beginning of the year, protective netting was fitted to the chimney to prevent birds from entering and subsequently fouling it. This measure helps to improve hygiene, prevent blockage of the drainage outlet inside the chimney and avoid potential operational complications.

In August, a new restoration workshop specialising in wood was established. The workshop expanded the Museum’s specialist facilities and created conditions for restoring wooden collection items using specialised methods and equipment. The new facility helps to improve the efficiency of restoration work.

Towards the end of the year, two specialised scanners for digitising collection items, the HD Apeiron 42 and the i2s QUARTZ A0, were acquired and installed in the digitisation room. The new equipment significantly expands the facility’s technical capabilities, enabling high-quality, non-invasive digitisation of collection materials in a variety of formats and supporting their long-term preservation, documentation and accessibility.

In December, the restoration workshops were equipped with specialised chemical storage cabinets. This measure ensured the safe storage of the chemicals in use, improved protection of staff health and met applicable safety and hygiene regulations. The cabinets help to organise the workplace more effectively and minimise risks associated with handling hazardous substances.

In the autumn, fire doors and a fire-resistant partition were installed in the basement because the original doors and wall no longer met requirements. Given the age of the building, their fire resistance could not be determined, and signs of corrosion were visible in several places.

In November, the outdated transformer station was modernised to improve the operational reliability, safety and energy efficiency of the building’s electrical distribution system. The measures reduced the risk of faults and created conditions for the stable and safe operation of technical equipment.

Other Buildings

In 2025, the Czech Museum of Music’s Technical Administration Department was responsible for a total of 9 buildings.

During 2025, cooperation between the National Museum and the City of Prague, the owner of the Lapidarium building, enabled repairs to its façade, including windows and entrance doors, to be completed. Damaged rooflights were also replaced.

At the Czech Museum of Music, plasterwork in the exhibition spaces was repaired, and interior doors were repaired and repainted on an ongoing basis. Window blinds were also installed in the lecture hall, which underwent building repairs and was furnished with new chairs.

The Memorial to František Palacký and František Ladislav Rieger was expanded on the first floor of the late Baroque MacNeven Palace to include new spaces serving as a lecture room and operational facilities, including a previously lacking visitor toilet.

Space rentals

Probably the most important source of income is generated from the rental of free space. Each space rental is unique, which is why our sales department places great emphasis on carefully analysing the local market, monitoring the needs of the target group (companies from different sectors of the economy – automotive, banking and event agencies) and adapting the offer flexibly where possible. Rental income consists of long-term rentals of business premises and short-term rentals of premises.

Other National Museum Buildings

The National Museum is not just a complex of buildings on Wenceslas Square in Prague, but a collection of many buildings. Some of them are open to the public, intended for the presentation of the National Museum’s collections, others are primarily intended as depositories where cultural heritage is preserved for future generations. The Náprstek Museum is one of those publicly accessible buildings.

The year 2023 was marked by the continuation of the preparations for the project of the Náprstek Museum depository in the premises in Horní Počernice towards the issuance of a building permit. Detailed materials on the volumes of the collections and furnishings were prepared for the future tender for the logistics of the move from the Náprstek Museum to Horní Počernice and submitted to the NM Building Department. An important update of the fire safety solution in the Náprstek Museum was carried out and a solution was proposed that is needed even in a situation where the building is about to be renovated.

During the year, the newly leased premises at Zbraslav Castle were also being prepared for the Historical Museum of the National Museum, where researchers and collections will be moved from the former Švýcárna in Prague 5, which will be returned to the capital city of Prague. It was necessary to make structural modifications to the castle building so that it not only suited us, but also met the strict requirements of the PBŘ and the building authority, which was achieved in a very short time.