The National Museum’s Investment Development Department fulfils the primary task of ensuring proper care for all buildings, including national cultural monuments, cultural monuments and modern buildings. Through the renovation of selected buildings and the construction of new depositories, it helps to develop the National Museum’s facilities and infrastructure, creating space for new exhibitions and, above all, for the proper storage of valuable collection items of differing types and technical specifications.
The revitalisation of the Náprstek Museum continued with design work for the historic complex on Betlémské náměstí and the start of construction of the Central Depository at the National Museum’s premises in Horní Počernice. The tender to select the depository’s construction contractor was completed, and the National Museum received a grant to finance the building. In October, the site was handed over to the contractor and construction work began.
In the first half of 2025, all the specified restoration work begun in the previous year on the cast-iron plaque bearing the inscription “BARRANDE” was completed, including gilding the individual letters with gold leaf. A total of 13 g of 24-carat gold was used for the gilded area of 4.8 m². The complete plaque, consisting of four sections, was returned to its original position and securely anchored to the rock face at Barrandov.
Several organisations contributed financially to the restoration of the “BARRANDE” plaque. In addition to the National Museum, these were CEC Group, s.r.o., the Prague 5 Municipal District and the National Museum Society.
In the basement of the National Museum’s Historical Building, the walls of the visitor cloakrooms in the so-called Column Hall were repainted to improve their appearance. Heavy visitor traffic since the Historical Building reopened after renovation in 2018 had left its mark on the paintwork. To prevent further soiling, and with the approval of heritage conservation staff, a special protective coating was applied to the final paint layer, allowing dirt caused by everyday use to be cleaned off regularly. Standard painting covered 978 m², while the protective coating covered 688 m². At the same time, the anchoring of the historic benches was adjusted to prevent their use from damaging the paintwork and, in particular, the plaster edges of the columns in the visitor cloakrooms.
Seven years after completion of the renovation of the National Museum’s Historical Building, weathering and increased ground moisture caused the first signs of deterioration in the building’s plinth. A specialist restoration company carried out a detailed condition survey, including sampling to determine the salt content of the sandstone plinth and establish an approach to its comprehensive restoration.
On the basis of the survey findings, a restoration proposal was prepared and submitted to the City of Prague’s Heritage Conservation Department as part of the statutory procedure. A binding approval of the proposal was issued at the end of 2025. Restoration of the building’s stone plinth will be carried out in 2026, including final colour matching and treatment against biological growth.
To improve working conditions for National Museum Library staff at the Governor’s Summer Palace in Stromovka, a mobile air-conditioning system was supplied and fully installed.
Under the supervision of heritage conservation staff, we continued restoring a total of 12 windows on the western side of the Governor’s Summer Palace and protecting the stone balustrade and its pinnacles from weathering.
At the Czech Museum of Music in Karmelitská Street, Prague 1, all preparatory work for the planned renovation of the roof lantern was completed. This primarily involved completing the statutory procedure for issuing the building permit and finalising the tender documentation for selecting a contractor. The procurement procedure was completed in the third quarter of 2025, with the contract awarded to the bidder offering the most advantageous price. In view of weather conditions, renovation is scheduled to begin in spring 2026. Once this work has been completed, the stone flooring in the main hall beneath the renovated roof lantern will also be restored.
As part of the care of heritage-listed buildings entrusted to the National Museum, minor local building works were also carried out throughout the year. These included work at the natural history museum building in Horská Kvilda, the Museum of Czech Puppets and Circus in Prachatice, the Terezín depositories, Vrchotovy Janovice Chateau and the Governor’s Summer Palace in Stromovka.
In the second half of the year, building work also began at the Náprstek Museum on Betlémské náměstí in Prague 1, involving alterations to the interior to meet the building’s fire safety requirements. The work will be fully completed in the first quarter of 2026.